Statement Of Work Page:2


ROOF:
  1. Remove existing roof
  2. Replace any damaged sheeting or starter board
  3. Install new 15 lbs felt paper
  4. Install new dimensional composite shingle roof (charcoal color)
  5. Paint all roof penetrations black
LANDSCAPE:
  1. Removal all debris in front and back yard
  2. Removal all weeds in front and back yard
  3. Install sod in the front and back yard
  4. Cut in planter boxes next to house and fence in front and back yard and plant drought tolerant plants
  5. Test irrigation system and repair where needed or install one in front yard
WINDOWS:
  1. Replace all windows with retrofit insert windows
  2. Replace all sliders with retro fit
DEMO (INTERIOR):
  1. Remove all trash in house
  2. Demo kitchen and remove cabinets
  3. Demo existing bathroom toilet, vanity, tile floor and shower surround
  4. Remove all tile flooring
  5. Scrape popcorn ceiling
  6. Remove all window coverings
  7. Do not damage wood floor as we are keeping it (install rosin paper to protect flooring)
Next TOC-B TOC-A TOC-C TOC-W TOC-I Cover